GrowerSELECT® Installation Manuals Binder
Hog Slat Inc. Newton Grove, NC USA February 2017 15 Feed Bins Roof Panels The roof and sidewall ladders are centered between top sheet vertical seams 1. Begin caulking roof panels along the inside edge of one side and the inside edge of the top corrugated flange, as shown. 2. Align the center of the first roof panel with any of the top sidewall sheet vertical seams. 3. Assemble roof decks over the top of the previous panel in a counterclockwise direction. Use the HS712 Hex Bin Bolts and the HS722 Hex Nuts. Keep bolt heads to the outside. 4. After determining the ladder location, add the two Roof Ladder Support braces at each side of the one roof panel that the ladder will be centered on. 5. After all roof panels are installed, caulk the inside flange of the peak ring and attach to roof using HS712 Hex Bin Bolts and the HS722 Hex Nuts Inside Inside Caulk these inside edges of each roof panel (with slot at flange corner) Inside 3/8 x1/2 slot = Ladder Location Options * * * * 12’ Diameter * * 6’ & 7’ Diameter * * * 9’ Diameter Ladder support Brackets Bolt to the inside of Feed Bin
Made with FlippingBook
RkJQdWJsaXNoZXIy MTA3MzU=