GrowerSELECT® Installation Manuals Binder
Hog Slat Inc. Newton Grove, NC USA August 2016 14 Ventilation Systems 9. If mounting machine horizontally in order to pull cables straight from end of machine, remove (2) plastic plugs found at top of machine to access pre-punch holes for routing cables. Loop cable around bearing supported pulley to ensure even load distribution on load block. Use 3 ½” diameter V-groove pulley to maintain proper cable spacing. (Figure 17) Figure 17 10. To secure cable to load block, run cable through hole nearest the center in load block, then loop back up through the outboard hole. Tighten all set-screws . (Figure 18) Figure 18 SET SCREWS SET SCREWS
Made with FlippingBook
RkJQdWJsaXNoZXIy MTA3MzU=