GrowerSELECT® Installation Manuals Binder
Hog Slat Inc. Newton Grove, NC USA May 2017 19 GROW-DISK ™ Feed System 8. Push the cable/fish tape again through the outgoing tube at the first corner until it comes out at the next corner. 9. Pull the conveyer chain from the second corner through the tubing. If the section of tubing is longer than the chain, connect a new section of chain. (Details step 7) 10. Repeat this process (step 8 & 9) until the conveyer chain is pulled through the complete conveyer tubes, all corners, chain disk fill hopper and closed the loop at the other side of the Drive Unit. 11. Before you can install the conveyer chain in the Drive Unit; pull on the chain and disks until all the slack has been removed from each sides of the chain loop! 12. Confirm the conveyer chain is tight on the nylon wheel at each corner. 13. Adjust the tensioning rod (2) inward on drive unit (1) as far as possible towards the drive sprocket (5). This will allow the idler tensioning wheel (4) to get close to the drive sprocket for tightening chain (3) after assembled. 14. Wrap one end of the chain (3) around the idler wheel (4) and the other end of chain onto the drive sprocket (5). 15. Position the Safety Switch (6) approximately 2 inches from the left side of bracket. This will prevent the initial startup movement from causing an erroneous activation of switch due to any slack in chain or stretching of chain. 16. Cut the ends of each chain (3) so that the connection can be made in a convenient location.
Made with FlippingBook
RkJQdWJsaXNoZXIy MTA3MzU=